Nissan Altima Forum banner
1 - 1 of 1 Posts

·
Administrator
Joined
·
308 Posts
A good rule-of-thumb to follow is never apply 12V or run a continuity test, which is also applying 12V, to an unknown wire; in particular to wires where a module is supplying a ground; a good way to pop a transistor. To run a continuity test, always disconnect the wire at it's source. Make use of a wiring diagram where possible.
 
1 - 1 of 1 Posts
Top